OperationLog in & Log Out Door Access Manual Drop Validate a Bill Validated Drop Insta-Drop Extended Drop Manage Users Change Your PIN Change All PINs About Reports Print Reports Service Electrical Connections Printer Paper Silencing the Buzzer Error Messages Troubleshooting Tips Request Repair via Keypad Configuration Definitions CMP Application Initial Field Setup Setup Reports Server Ping Test Network Settings Regional (Clock) Supervision Setup Supervision Test Supervise Manually Commercial State |
XLV-iP CT8016Electrical Connections1. Connect the UPS (or surge protector) to a dedicated AC outlet.Note: Some UPS devices require some setup. Refer to instructions supplied with your UPS. 2. Connect the safe power supply to the UPS (or surge protector). 3. Feed the safe power supply cable through cabinet openings as needed and connect to the “SAFE POWER” port (Primary Side) on the rear of the safe (Fig. 8). Note: Validators will flash and stack several seconds after power is applied. Exact behavior will depend on which model validators are used. 4. Feed the alarm cable through cabinet openings as needed and connect to the “ALARM” port on the rear of the safe (Fig. 8). Note: It is the responsibility of the alarm company to connect the alarm cable to the alarm system. 5. Feed the data cable through cabinet openings as needed and connect to the “DISPLAY PANEL” port (Primary Side) on the rear of the safe (Fig. 3). Connect the other end to “PORT 1” on the rear of the control panel (Fig. 9). |
|
Copyright
©2002 Updated 4-16-09 |
||